Turnkey Delivery
Project Delivery & Lifecycle Support
From the initial engineering sketch to container arrival at Chattogram Port, mechanical installation, recipe calibration, and 24/7 spare parts support in Bangladesh.
01
Milestone 01Commercial Sourcing and Technical Alignment
Matching production requirements with verified European and Japanese OEM engineering.
IMT Engineering & Logistics Responsibility:
- Capacity vs footprint feasibility review
- Utility requirement calculation (Gas, Power, Steam, Compressed Air)
- Direct OEM quotation structuring and price negotiation
- Technical proposal submission with CAD line drawings
Client Factory Responsibility:
- Factory floor plan and ceiling height clearance data
- Target recipe specifications and dough/batter characteristics
Phase Decision Gate & Deliverable:Approved Engineering Contract and Line Layout Specification
02
Milestone 02L/C Documentation and Chattogram Port Clearance
Navigating Bangladesh banking, import documentation, and port customs.
IMT Engineering & Logistics Responsibility:
- Proforma Invoice (PI) structuring to match Bangladesh Bank L/C guidelines
- HS Code tariff classification and import permit alignment
- Chattogram Port customs documentation and bonded warehouse handling
- Landed cost modeling and inland transportation coordination to factory site
Client Factory Responsibility:
- Opening Letter of Credit (L/C) through nominated commercial bank
- Payment of customs duties and regulatory port clearances
Phase Decision Gate & Deliverable:Safe Delivery of Machinery Containers at Factory Site
03
Milestone 03Mechanical and Electrical Installation
Rigging, leveling, anchoring, and integration of production lines.
IMT Engineering & Logistics Responsibility:
- Laser guided conveyor leveling and mechanical module alignment
- Electrical cable routing and distribution panel connections
- Gas burner train piping and exhaust ducting installation
- Coordination with overseas OEM commissioning engineers (when deployed)
Client Factory Responsibility:
- Primary power supply, gas supply, and compressed air line drop points
- Unloading forklift/crane equipment and factory floor access
Phase Decision Gate & Deliverable:Mechanically and Electrically Integrated Turnkey Line
04
Milestone 04Trial Production, Calibration and Operator Training
Recipe loading, burner ignition supervision, and quality validation.
IMT Engineering & Logistics Responsibility:
- ESA burner sequence controller setup and flame safety interlocks
- DSP metal detector calibration (Fe, Non-Fe, SS 316 test pieces)
- Dry run testing followed by continuous wet dough/batter trial baking
- Hands on operator training for recipe changeovers and basic diagnostics
Client Factory Responsibility:
- Provision of raw materials (flour, sugar, fats, leavening agents)
- Assigned factory operators and maintenance technicians for training
Phase Decision Gate & Deliverable:Commercial Production Acceptance Certificate and Handover
05
Milestone 05Lifecycle Support and Genuine Spare Parts
Zero factory downtime guarantee through local service engineering.
IMT Engineering & Logistics Responsibility:
- On demand emergency troubleshooting via telephone and site visits
- Rapid supply of OEM replacement parts (burners, belts, motors, search heads)
- Annual preventive maintenance inspections and recalibration
- Software updates and production line speed optimizations
Client Factory Responsibility:
- Adherence to OEM routine lubrication and cleaning schedules
- Timely notification of anomalous machine behavior or error codes
Phase Decision Gate & Deliverable:Continuous Plant Uptime and Verified After Sales SLA
Factory Uptime Protection
Emergency Breakdown & Spare Parts Hotline
Operating an industrial baking line, CEPI dosing system, or ESA burner control with an active fault? Our senior service engineers are deployed locally for immediate on site diagnostic response.
